Site Index
MAG Logo: Navigate to the home page
Menu Separator Member Agencies
Regional Council
Committees
Projects
Menu Separator Transportation
Environmental Programs
Human Services
Information Services
Menu Separator Administration
Communications
Information Technology
Fiscal Services
2017 Specs and Details Cases Under Consideration

Calendar

MAY 2017
SunMonTueWedThuFriSat
  1  2  3  4  5  6 
 7  8  9  10  11  12  13 
 14  15  16  17  18  19  20 
 21  22  23  24  25  26  27 
 28  29  30  31    

Each year the MAG Standard Specifications and Details Committee reviews changes to the Uniform Standard Specifications and Details for Public Works Construction document. These changes are first reviewed in separate cases. This project page is designed to be a resource for committee members to access the most current versions of cases under consideration throughout the year. 

(Page last updated 04/27/17)

A summary of 2017 Cases with links to PDF working documents is shown in the table below:

Case 
Number
Description
of Case
Sponsor/
Agency
Date
Submitted

Last
Revision
 

Voting
Status
Comments/
Updates
Case 16-17:Revisions to Section 321: Address multiple concerns with testing for permit work.

Greg Groneberg,
Asphalt WG

07/06/1601/19/17

Voted:
04/05/17

APPROVED
Case 17-01:

Miscellaneous Corrections:
A. Correction to footnote in Table 725-1.
B. Corrections to Detail 505: Concrete Pipe Collar.
C. Correct spelling error in Section 337.3
D. Adjust Section 105.6 for Blue Stake name change to Arizona 811.
E. Correct Spelling in Section 630: “forecast” should be “for cast.”
F. Correct rebar depicted in Section B-B of Detail 206-1.
G. Change Minimum Sand Adhesion to Maximum in Section 331.4.2.3.
H. Correct reference for Granular Material (p. Index-5).
I. Correct water box cover references on Detail 390.

Bob Herz, 
MCDOT;
Warren White, Chandler;
Rod Ramos,
Scottsdale;
Jim Badowich,
Avondale.

01/04/1704/05/17  
Case 17-02:

Revisions to Section 337 Crack Sealing.

Bob Herz, 
MCDOT
01/04/1702/21/17 UPDATED
Case 17-03:Revision to Section 340.5.3 to allow measurement of curb ramp areas to be modified by standard details.Bob Herz, 
MCDOT
02/01/1702/01/17Voted:
03/01/17
APPROVED
Case 17-04:Revisions to Section 310: Correct specifications and references for rock correction procedure.Greg Groneberg,
Asphalt WG
02/01/1704/20/17
UPDATED
Case 17-05:New Sections 323 and 725: Material and Placement Specifications for Pervious ConcreteJeff Hearne,
Concrete WG
02/01/1704/25/17 UPDATED
Case 17-06: Update Detail 260: Replace existing Detail 260 Alley Entrance with a new Driveway Entrance that has a 2” roll curb and gutter.Warren White,
Chandler
05/03/1705/03/17 NEW

Get e-mail updates when this information changes / Learn more...

 

 
Meetings, Agendas and Minutes
Resource Library