Corridor-Level Performance
In an effort to provide succinct information about traveling across the region, a collection of corridors representing major commuting routes have been identified. In the sections below, performance of each corridor is represented with a chart reflecting the change in travel time by year. As summarized in Change in Travel Commute Times and shown in Travel Times Along Selected Commute Corridors, travel times in nearly all corridors have been increasing steadily.
Change in Travel Commute Times

Travel Times Along Selected Commute Corridors

The only exception is corridor number eight along Loop 101 from US 60 to Frank Lloyd Wright Boulevard. Discussed in the Project Spotlights section of this report, approximately $100.2 million was allocated to increase the capacity of Loop 101 facility, leading to the improved travel times.