Proposed Improvements
The proposed improvements are designed to reduce weaving and sudden braking, improve traffic flow, and increase roadway capacity throughout the study area. Key improvements include:
Braided Ramps: Separate entering and exiting traffic by relocating ramp connections and eliminating conflict points between on- and off-ramps. This reduces weaving and improves overall driving experience.
Collector-Distributor Roads: Adds a parallel roadway alongside freeway mainline to separate entering and exiting vehicles from freeway through traffic. This helps reduce harsh braking and weaving, improves safety, and maintains smoother traffic flow.
Mainline Improvements: Extending lanes where possible to reduce congestion and lane-drops.
Auxiliary Lane: Adds an extra lane between ramps that helps drivers enter, exit or merge more smoothly.
Ramp Improvements: Widen select exit ramps to two lanes, reducing traffic backups onto freeway travel lanes and minimizing stop-and-go conditions for drivers.
Direct HOV Ramp: Construct a direct freeway-to-freeway connection for HOV users, creating an exclusive ramp for carpool traffic. This reduces weaving, minimizes lane changes, and improves travel efficiency for HOV commuters.