Rio Reimagined Active Transportation Study

Visit our Community Engagement Website MAGRioActive.com. Share your ideas, leave comments on our interactive map, and take the survey.

The MAG Rio Reimagined Active Transportation Study is dedicated to identifying and establishing a connected regional trail alignment along the river corridor to promote safe and effective active transportation. By creating vital bicycle and pedestrian links to neighboring communities and identifying essential enhancements to non-motorized infrastructure, the study aims to maximize multimodal connectivity and support the Rio Reimagined initiative's overall vision.

In 2018, ten local agencies along the river corridor signed a statement of intent to collaborate on the Rio Reimagined initiative. These agencies include the cities of Avondale, Buckeye, Goodyear, Mesa, Phoenix, and Tempe; Maricopa County; Salt River Pima-Maricopa Indian Community; Gila River Indian Community; and the Salt River Project. Their goal is to coordinate, design, and develop the Salt and Gila River corridor into a vibrant riverfront for the Valley.

The MAG Rio Reimagined Active Transportation Study will be a significant contribution to the broader Rio Reimagined initiative.

PUBLIC COMMENT ON DRAFT STUDY

The Public comment period on the draft study is now open from October 6 to November 4.

Visit MAGRioActive.com to review the draft trail alignment along the Salt and Gila rivers and walk through details of the study. The 90-mile draft alignment was developed over a 20-month study process, incorporating comments from hundreds of stakeholders in coordination with six municipalities, two Native nations, unincorporated Maricopa County, and ASU Rio Reimaged.

The draft study is presented as an interactive website where you can provide comments using the built-in survey tool at MAGRioActive.com or send an email directly to [email protected]

Study Objectives

  • Corridor-wide Connectivity
  • Community Connections
  • Trail Alignment
  • Project Coordination

Study Area

Rio Reimagined Active Transportation Project Boundary Map

Timeline

Rio Reimagined Active Transportation Study Timeline March 2025 - August 2026

 

Please sign up to receive project updates, public meeting notices, surveys, and requests for comment announcements.