Documents

Case 20-01: Misc. Corrections A-G - Rev 9/1/2020
Case 20-01: Misc. Corrections A-F - Rev 7/14/2020
Case 20-04: Revisions to 323 Pervious Concrete, New 303 Base Course and New Detail - Rev 8/10/20
Case 20-03: Revisions to Section 725 Concrete Cement Concrete - Rev 8/5/20
Case 20-04: Revisions to 323 Pervious Concrete, New 303 Base Course and New Detail - Rev 7/28/20
Case 19-12: Revisions to Detail 550-2 Spillway Inlet and Outlet - Rev 6/25/20
Case 20-04: Revisions to 323 Pervious Concrete, New 303 Base Course and New Detail
Case 19-04: Revisions to Section 360 Telecommunications - Rev 6/9/20
Case 19-11: New Subsection 611.5 Manhole Vacuum Testing - Rev 6/18/20
Case 19-09: New Section 626 Corrosion Coating of MH - Rev 6/18/20
Case 19-12: Revisions to Detail 550-2 Spillway Inlet and Outlet - Rev 5/28/20
Case 20-01: Misc. Corrections A-E
Case 20-03: Revisions to Section 725 Concrete Cement Concrete
Case 20-02: Removal of Detail 346
Case 19-12: Revisions to Detail 550-2 Spillway Inlet and Outlet - Rev 2/10/20
Case 19-11: New Subsection 611.5 Manhole Vacuum Testing - Rev 2/24/20
Case 19-09: New Section 626 Corrosion Coating of MH - Rev 8/24/20
Case 19-04: Revisions to Section 360 Telecommunications - Rev 2/24/20
Case 20-01: Misc. Corrections A-D
Case 20-01: Misc. Corrections A-C
Case 19-04: Revisions to Section 360 Telecommunications - Rev 9/16/19
Case 20-01: Misc. Corrections
Case 19-11: New Subsection 611.5 Manhole Vacuum Testing - Rev 8/27/19
Case 19-10: New Section 627 Manhole Insecticide - Rev 8/27/19
Case 19-09: New Section 626 Corrosion Coating of MH - Rev 8/27/19
Case 19-08: Slurry Seal - Section 332 and 715 - Rev 8/27/19
Case 19-07: Microsurfacing - Section 331 and 714 - Rev 8/27/19
Case 19-04: MCDOT Comments
Case 19-01: Misc. Corrections (A-I) - Rev 08/23/19
Case 19-01: Misc. Corrections (A-H) - Rev 08/14/19
Case 19-01: Misc. Corrections (A-G) - Rev 07/29/19
Case 18-14: New Polymer Concrete Manhole Specs and Details - Rev 7/31/19
Case 19-11: New Subsection 611.5 Manhole Vacuum Testing - Rev 7/3/19
Case 19-10: New Section 627 Manhole Insecticide - Rev 7/3/19
Case 19-09: New Section 626 Corrosion Coating of MH - Rev 7/3/19
Case 19-08: Slurry Seal - Section 332 and 715 - Rev 7/3/19
Case 19-07: Microsurfacing - Section 331 and 714 - Rev 7/3/19
Case 19-06: Section 321.14.4 Patching Core Holes - Rev 7/3/19
Case 18-14: New Polymer Concrete Manhole Specs and Details - Rev 6/26/19
Case 19-05: Revisions to Detail 262 - Rev 6/06/19
Case 18-10: New Detail 238-4 Single Ramp - Rev 6/06/19
Case 18-14: New Polymer Concrete Manhole Specs and Details - Rev 6/03/19
Case 19-05: Revisions to Detail 262 - Rev 5/29/19
Case 19-04: Revisions to Section 360 Telecommunications - Rev 5/23/19
Case 19-03: Revisions to Section 713 Emulsified Asphalt Materials - Rev 5/29/19
Case 19-02: Joint Cut and Patch Details 200-1 and 200-2 - Rev 5/28/19
Case 18-10: New Detail 238-4: Single Sidewalk Ramp, Mid-Block Residential with 4” Roll Curb - Rev 5/28/19
Case 19-05: Revisions to Detail 262 - Rev 4/30/19
Case 19-02: Joint Cut and Patch Detail 200-1 - Rev 4/17/19
Case 18-10: New Detail 238-4 Single Ramp Chandler Comments
Case 18-14: New Polymer Concrete Manhole Specs and Details - Rev 4/30/19
Case 19-04: Revisions to Section 360 Telecommunications
Case 19-03: Revisions to Section 713 Emulsified Asphalt Materials
Case 18-14: Response to Phoenix comments on Polymer Concrete Manholes
Case 19-01: Misc. Corrections (A-F) - Rev 03/26/19
Case 18-10: New Detail 238-4 Single Ramp
Case 18-14: New Polymer Concrete Manhole Specs and Details - Rev 2/25/19
Case 19-01: Misc. Corrections (A-E) - Rev 03/1/19
Case 19-02: Joint Cut and Patch Detail 200-1 - rev 1/9/19
Case 19-01: Misc. Corrections A-D - rev 2/6/19
Case 18-14: New Polymer Concrete Manhole Specs and Details - Rev 2/11/19
Case 18-10: New Detail 238-4: Single Sidewalk Ramp, Mid-Block Residential with 4” Roll Curb - Rev 1/9/19
Case 18-05: Revisions to Safety Rail anchorage and references - Rev 2/11/19
Case 18-13: Revisions to Section 602, Table 602-1, Add open cut - Rev 9/5/18
Case 18-14: New Polymer Concrete Manhole Specs and Details Rev 8/19/18
Case 18-13: Revisions to Section 602, Table 602-1, Add open cut - Rev 8/2/18
Case 18-10: New Detail 238-4, Revise 221 - Rev 8/6/18
Case 18-05: Draft Revised Safety Rails Details - Rev 8/2/18
Case 17-12: Revisions to Section 610 - Rev 8/23/18
Case 18-14: New Polymer Concrete Manhole Specs and Details Rev 7/17/18
Case 18-13: Revisions to Section 602, Table 602-1 Rev 7/24/18
Case 17-09: Revisions to Section 611 Testing - Rev 7/23/18
Case 18-12: Revisions to Details 360-1, 360-2 Rev 7/24/18
Case 18-14: New Polymer Concrete Manhole Specs and Details
Case 18-13: Revisions to Section 602, Table 602-1
Case 18-12: Revisions to Details 360-1, 360-2
Case 17-09: Revisions to Section 611 Testing - Rev 6/19/18
Case 18-05: Revision to Safety Rail Anchorage - Rev 05/30/18
Case 18-11: Revisions to Details 236-3 and 237-3
Case 18-10: New Detail 238-4
Case 18-09: Revisions to Section 710
Case 18-04 Detail 252 Bus Bays - rev 05/07/18
Case 18-08: Revisions to Section 740 - Rev 05/02/18
Case 17-09: Revisions to Section 611 Testing - Rev 4/25/18
Case 18-07: Revisions to Section 321 and 325 Binder Content - Rev 4/23/18
Case 18-06: Revisions to Detail 303 for PVC Rev 04-09-18
Case 18-04: Detail 252 Bus Bays - rev 04/09/18
Case 18-07: Revisions to Section 321 and 325 Binder Content
Case 18-05: Draft Revised Safety Rails Detail 145
Case 18-02: Revisions to Section 718 and 334 - Rev 03/22/18
Case 18-04: Detail 252 Bus Bays - rev 03/07/18
Case 18-06: Revisions to Detail 303 for PVC Rev 02-26-18
Case 18-03: Revisions to Section 729 - Rev 02/15/18
Case 18-02: Revisions to Section 718 - Rev 02/15/18
Case 18-05: Revisions to Details 145, 501, 502 - rev 02/07/18
Case 18-04 Detail 252 Bus Bays - rev 02/05/18
Case 18-03: Revisions to Section 729 - Rev 01/18/18
Case 18-02: Revisions to Section 718 - Rev 02/07/18
Case 18-01: Misc. Corrections
Case 18-03: Revisions to Section 729
Case 18-02: Revisions to Section 718