Documents

Case 21-15: New Landscaping Details
Case 21-13: Detail 227 Sediment Trap - Rev 9/01/21
Case 21-12 Revisions to Section 601 to include Minimum Testing Frequencies Rev 9/01/21
Case 21-11: Revisions to Section 611 - Potable Water Hauling
Case 21-13: Detail 227 Sediment Trap - Rev 8/24/21
Case 21-12 Revisions to Section 601 to include Minimum Testing Frequencies Rev 8/24/21
Case 21-13: Detail 227 Sediment Trap - Rev 8/19/21
Case 21-08: New Curb Cut Details 226-1 and 226-2 Rev 8/20/21
Case 21-05: New Details 542-1 and -2 Catch Basin Rev 8/20/21
Case 21-01: Misc. Corrections (A-C) Rev 8/20/21
Case 21-12 Revisions to Section 601 to include Minimum Testing Frequencies rev 8/04/21
Case 21-05: New Details 529-1 and -2 Catch Basins Rev 7/28/21
Case 21-13: Detail 227 Sediment Traps Rev 7/28/21
Case 21-08: Comments from MCDOT
Case 21-13: Detail 227 Sediment Traps
Case 21-09: Revise Details 419-2 and 420-2 rev 6/28/21
Case 21-08: New Curb Cut Details Rev 6/23/21
Case 21-05: New Details 529-1 and -2 Catch Basins Rev 6/24/21
Case 21-12 Revisions to Section 601 to include Minimum Testing Frequencies rev 6/16/21
Case 21-04: Detail 422 Revisions to allow corrosive resistant adjustment rings Final 5/17/21
Case 21-03: Detail 212 Pothole Detail Revisions Rev 5/25/21
Case 21-09: Detail 420 - Comments received from Clay Pipe Assoc.
Catch Basin Detail 529-1, 2 Redline Comments from MCDOT
Minimum Testing Frequencies 05/12/21 Draft
Case 21-10: Revisions to Section 776 Masonry Mortar and Grout
Case 21-02: Revisions to Detail 110-2 Rev 5/18/21
Case 21-09: Revise Detail 420-2 to Extend Clay Pipe from 1' to 2'
Case 21-07: Thermoplastic pipe definition and Section 611 Revisions Rev 4/26/21
Case 21-03: Detail 212 Pothole Detail Revisions Rev 4/28/21
Case 21-02: Revisions to Detail 110-2 Rev 4/28/21
Case 21-04: Detail 422 Revisions to allow corrosive resistant adjustment rings Rev 4/28/21
Case 21-08: New Curb Cut Details Rev 4/22/21
Case 21-05: New Details 529-1 and -2 Catch Basins Rev 4/26/21
Case 21-08: New Curb Cut Details
Case 21-07: Thermoplastic pipe definition and Section 611 Revisions
Case 21-02: Revisions to Detail 110-2 Rev 3/26/21
Case 21-06: New Detail 272 Manhole/Valve Box Curb Realignment Rev 3/24/21
Case 21-06: New Detail 272 Manhole/Valve Box Curb Realignment
Case 21-05: New Details 529-1 and -2 Catch Basins
Case 21-04: Detail 422 Revisions to allow corrosive resistant adjustment rings Rev 2/23/21
Case 21-01: Misc. Corrections (A-C)
Case 21-04: Detail 422 Revisions to allow corrosive resistant adjustment rings
Case 21-03: Detail 212 Pothole Detail Revisions
Case 21-01: Misc. Corrections (A-B)
2021 Case List - January
Case 21-02: Revisions to Detail 110-2
Case 21-01: Miscellaneous Corrections