Documents

Case 26-09: Revise Section 631 to Include PEXa Pipe
OROW 26-B: CMP Multiple Barrel Backfill Details - Rev 6/02/2026
Case 26-07: Details 131-1 -2 and -3 Street Sign Base - Rev 5/26/26
Case 26-08: Revise Section 632 and Detail 399 series for Tracer Wire Installation - Rev 5/26/26
Case 26-06: Revisions to Detail 160 Chain Link Fence - Rev 5/14/26
OROW 26-A: Phoenix Comments
OROW 26-A: Riprap Spillway Details - Rev 5/26/26
Case 26-05: Revise Details 520 and 521- Rev 3/25/2026
Case 26-04: Revise Section 602 - Rev 5/11/26
Case 26-03: Revise Curb and Gutter Details 220-1, 220-2 - Rev 5/22/26
Case 26-02: Revise Details 206-1 and 206-2 CONCRETE SCUPPER - Rev 3/13/26
Case 26-01: Miscellaneous Corrections
Case 25-16: Section 795 Landscaping Revisions
Case 25-10: MCDOT Comments in Details 206-1, 206-2
Case 25-15: PROWAG Revisions to Details 236 and 237 Series - Rev 8/22/25
Case 25-14: Revise Detail 420-1 and Section 625 to Form Manhole Bases - Rev 8/4/25
Case 25-13: Update Section 220.8 Riprap Payment
Case 25-12: Revise Sections 326 and 719 - Rev 2/24/26
Case 25-11: Revise Cast Iron Manhole Frame Details - Rev 8/5/25
Case 25-10: Update MAG Details to Reference OROW Spillway Detail - Rev 7/16/25
Case 25-02: Phoenix Comments
Case 25-09: Revise Details 303-1 and 303-2 Pipe Joint Restraints (with supporting documentation) - Rev 8/18/25
Case 25-08: New Section 746 Fiberglass Reinforced Polymer Mortar Pipe - Rev 6/23/25
Case 25-07: Revise Section 340.3.9 Tolerances to Meet PROWAG Standards - Rev 5/21/25
Case 25-06: Revise Detail 260 to Reduce Slopes to 5% - Rev 7/02/25
Case 25-05: Revisions to Section 415 Flexible Guardrails
Case 25-04: Update Arizona Test Methods to AASHTO - Rev 5/01/25
Case 25-03: Section 751 Crosslinked Polyethylene Pipe - Rev 4/29/25
Case 25-01: Miscellaneous Corrections (A-G)
OROW 25-A: Stormwater Harvesting Basin - Rev 6/13/25
Case 25-02: Precast Reinforced Concrete Box Culvert Spec and Details - Rev 7/23/25
Case 24-12: Revisions to Section 626 - Corrosion Protective Coating - Rev 2/12/25
OROW 24-C: CMP Underground Detention/Retention Tanks - Rev 05/07/25
Case 25-01: Miscellaneous Corrections (A-B)
Case 24-12: Revisions to Section 626 - Corrosion Protective Coating - Glendale Comments 1/21/25
Case 24-09: Revise Section 710 to Include Liquid Anti-strip - Rev 7/19/24
OROW 24-E: Transfer Sections and Details from MAG to OROW Book - Rev 8/26/24
OROW 24-D: Infiltration Trench Specifications and Detail - Rev 6/30/25
OROW 24-C: CMP Underground Detention/Retention Tanks - Rev 9/04/24
OROW 23-10: Thermoplastic Bodied PVC Drain Basins - Rev 7/30/24
OROW 23-06: Rock Bioswales Specs and Details - Rev 7/18/24
Case 24-13: Revisions to Section 620 - Cast-in-Place Concrete Pipe (CIPCP) - Rev 5/21/25
Case 24-12: Revisions to Section 626 - Corrosion Protective Coating
Case 23-09: Tracer Wire Specifications and Details - Rev 7/24/24
Case 24-05: Revise Section 631, New Detail 341 - Rev 8/21/24
Case 24-11: Revisions to CMP Specs Sections 621, 760 and 771 - Rev 7/26/24
Case 24-01: Miscellaneous Corrections (A-K) - Rev 8/20/24
Case 23-09: Tracer Wire Specifications and Details - Rev 5/08/24
Case 24-10: Revise Section 602 for New Casing Materials
Case 24-09: Revise Section 710 - Liquid Anti-Strip - Rev 7/19/24
Case 24-08: Revise Min Paving Temperatures in Sections 321 and 326 - Rev 6/13/24
OROW 23-06: Detail 540 Phoenix Comments
OROW 24-B: Updates to Detail 346 - Move to OROW Book - Rev 8/14/24
Case 24-07: Delete Detail 389 - Rev 6/24/24
Case 24-06: Revisions to Detail 345-2 - Rev 8/09/24
Case 24-05: Update Section 610 with DIPRA Reference
Case 24-04: Delete Details 302-1 and 302-2
OROW 24-A: Add Spillway Details, Move Detail 227 - Rev 8/23/24
Case 24-03: Remove specific gravity test from Table 714-2
Case 24-01: Miscellaneous Corrections (A-C) - Rev 3/22/24
Case 23-09: Tracer Wire Specifications and Details - Rev 3/01/24
OROW 23-06: Rock Bioswales Specs and Details - Rev 6/04/23
Case 23-09: Tracer Wire Specifications and Details - Rev 1/31/24
OROW 23-10: Thermoplastic Bodied PVC Drain Basins - Rev 05/15/24
OROW 23-06: Rock Bioswales Specs and Details - rev 10/13/23
OROW 23-10: Thermoplastic Bodied PVC Drain Basins - Rev 11/16/23
Case 24-02: Revise Section 711 Paving Asphalt to remove PPA and REOB
Case 24-01: Miscellaneous Corrections
Case 23-09: Tracer Wire Specifications and Details - Rev 8/29/23
Case 23-05: Revisions to Detail 212 Utility Pothole Repair and Section 355 - Rev 8/02/23 FINAL
Case 22-15: Subsection 718.4 Solar Reflective Pavement Coatings Rev 8/14/23
Case 23-01: Misc. Corrections A-F - Rev 8/07/23
Case 23-12: Supplemental Specs and Details for OROW document format - Rev 8/06/22
Case 23-09: Tracer Wire Specifications and Details - Rev 7/25/23
Case 23-05: Revisions to Detail 212 Utility Pothole Repair and Section 355 - Rev 7/19/23
Case 23-09: Tracer Wire Specifications and Details - Rev 6/29/23
Case 23-12: Outside Right-of-Way-Document-Format
Case 23-11: Change "fly ash" to "coal ash" and add definitions
Case 23-02: Revisions to Section 725 Portland Cement Concrete - Rev 6/07/23
Case 23-08: Revision to Section 610.10 Gaskets
Case 23-01: Misc. Corrections A-E - Rev 7/12/23
Case 23-02: Revisions to Section 725 Portland Cement Concrete - Rev 5/18/23
Case 23-10: Thermoplastic Bodied PVC Drain Basins
Case 23-09: Tracer Wire Specifications and Details
Case 23-07: Concrete Collar Detail Update
Case 23-06: New Vegetated or Rock Bioswales Detail and Specs - Rev 4/25/23
Case 23-05: Revisions to Detail 212 Utility Pothole Repair and Section 355 - Rev 4/25/23
Case 23-02: Revisions to Section 725 Portland Cement Concrete - Rev 04-20-23
Case 23-02: Revisions to Section 725 Portland Cement Concrete - Rev 03-01-23
Case 23-06: New Vegetated or Rock Bioswales Detail and Specs
Case 23-05: Revisions to Detail 212 Utility Pothole Repair
Case 23-04: Revisions to Tables in Sections 714 and 715
Case 23-03: Revisions to Section 710 Asphalt Concrete
Case 23-02: Revisions to Section 725 Portland Cement Concrete
Case 23-01: Misc. Corrections
Case 22-15: Subsection 718.4 Solar Reflective Pavement Coatings Rev 8/22/22
Case 22-06: New Irrigation System Details - Rev 8/15/22
Case 22-08: Detail 230 Sidewalks Cross Slope Tolerances - Rev 8/08/22
Case 22-13: New Detail 200-3, Revisions to 200-1, 200-2 - Rev 8/02/22
Case 22-13: New Detail 200-3, Revisions to 200-1, 200-2 - Rev 7/18/22
Case 22-08: Detail 230 Sidewalks Cross Slope Tolerances - Rev 7/26/22
Case 22-06: New Irrigation System Details - Rev 7/25/22
Case 22-05: Revised Irrigation Specifications 440 and 757 - Rev 7/26/22
Case 22-15: Subsection 718.4 Cool Pavement Coatings
Case 22-12: Water Stop Gasket Requirements - Sections 618 and 738 - Rev 6/29/22
Case 22-11: Revisions to Detail 420-1 Note 6 - Rev 6/07/22
Case 22-10: Revisions to Section 702 Base Materials - Rev 6/24/22
Case 22-08: Detail 230 Sidewalks Cross Slope Tolerances - Rev 6/02/22
Case 22-05: Maricopa County Comments
Case 21-15: New Landscaping Details - Rev 6/22/22
Case 22-08: Detail 230 Sidewalks Cross Slope Tolerances - Rev 5/25/22
Case 22-14: Revise Sections 750, 759, Delete Section 752
Case 22-13: New Detail 200-3, Revisions to 200-1, 200-2
Case 22-11: Revisions to Detail 420-1 Note 6 - Rev 5/16/22
Case 22-10: Revisions to Section 702 Base Materials - rev 5/4/22
Case 22-07: New Valve (350) and Manhole (450) Abandonment Details - Rev 5/16/22
Case 21-15: New Landscaping Details - Rev 5/20/22
Case 21-14: Revised Landscaping Specifications - Rev 5/25/22
Case 22-12: Water Stop Gasket Requirements - Sections 618 and 738
Case 22-07: New Valve (350) and Manhole (450) Abandonment Details - Rev 4/27/22
Case 22-04: Update Collar Slope on Details 120, 270, 271 and 441 - Rev 5/25/22
Case 22-03: Update Concrete Collar on Detail 391-1, 391-2 and 392 - Rev 4/25/22
Case 22-11: Revisions to Detail 420-1 Note 6
Case 22-10: Revisions to Section 702 Base Materials
Case 22-09: Revisions to Sections 311 and 312
Case 22-08: Detail 230 Sidewalks Cross Slope Tolerances
Case 22-07: New Valve and Manhole Abandonment Details
Case 22-05: Revised Irrigation Specifications 440 and 757
Case 22-04: Update Collar Slope on Details 120, 270, 271 and 441
Case 22-03: Update Concrete Collar on Detail 391-1, 391-2 and 392 - Rev 3/30/22
Case 21-15: New Landscaping Details - Rev 3/02/22
Case 21-14: Revised Landscaping Specifications - Rev 3/02/22
Case 22-03: Update Concrete Collar on Detail 391-1
Case 22-02: Revisions to Detail 260
Case 22-01: Miscellaneous Corrections A-C
Case 21-15: New Landscaping Details
Case Updates