March 19, 2013, 1:30 PM

The topics being discussed in the working group are: * Focusing on updating the manhole details and specifications, including adding the option for precast bases. Discussion on moving the rim adjustment detail to the Streets/ Related Work (Part 300) section of MAG Standard Specifications and Details. * They also would be continuing to work on revising the pipe installation specifications and incorporating new pipe materials. This work would include getting the trench widths to match ASTM standards and updating terminology (Sections 601 and 603). * Revisions to the testing and flushing sections.