2022 Specifications and Details Cases Under Consideration

Each year the MAG Standard Specifications and Details Committee reviews changes to the Uniform Standard Specifications and Details for Public Works Construction document. These changes are first reviewed in separate cases. This project page is designed to be a resource for committee members to access the most current versions of cases under consideration throughout the year. 

(Page last updated 09/28/22)

A summary of 2022 Cases with links to PDF working documents is shown in the table below:

Case 
Number

Description
of Case

Sponsor/
Agency

Date Submitted

Last Revision

Voting
Status

Comments/
Updates

Case 21-14:

Revise Landscaping Specifications: Section 425 Topsoil, Section 430 Landscaping, and Section 795 Landscape Materials.

Outside ROW
Ryan Nichols, Mesa

07/07/21

05/25/22

Approved
06/01/22

 

Case 21-15:

New Landscaping Details 600-1 through 600-18

Outside ROW
​Ryan Nichols, Mesa

07/07/21

06/22/22

Approved
07/06/22

 

Case 22-01:

Miscellaneous Corrections
A. Section 725.7.2: Remove “and” from last sentence of first paragraph.
B. Detail 535-4: Change in notes, “ASTM A-48-83” to “ASTM A48”
C. Detail 140: Change in note 3, “ASTM A54” to “ASTM A123”

Jeff Hearne,
Concrete WG
Ryan Nichols, Mesa

02/02/22

02/02/22

Approved
09/07/22

 
Case 22-02:

Proposed Revision to Detail 260, Retrofit Driveway or Alley Entrance – Commercial concrete thickness.

Warren White, Chandler

02/02/22

02/02/22

Approved
04/06/22

 
Case 22-03: Update Concrete Collar on Details 391-1, 391-2 and 392. Remove Type B installation option.. Roy Herrington, Scottsdale 02/23/22 04/25/22 Approved
06/01/22
 
Case 22-04: Update Concrete Collar slope on Details 120, 270, 271, and 441. Roy Herrington, Scottsdale 04/06/22 04/25/22 Approved
06/01/22
 
Case 22-05: Revise Irrigation Specifications: Section 440 Landscape Irrigation System Installation, and Section 757 Irrigation System Materials. Outside ROW
​Ryan Nichols, Mesa
04/06/22 07/26/22 Approved
09/07/22
 
Case 22-06: New Irrigation Details: 601-1 through 601-26. Outside ROW
​Ryan Nichols, Mesa
04/06/22 08/15/22 Approved
09/07/22
 
Case 22-07: New Water Valve (350) and Manhole (450) Abandonment Details. Warren White, Chandler 04/06/22 05/16/22 Approved
07/06/22
 
Case 22-08: Revise Detail 230 Sidewalks, to clarify cross-slope tolerances.  Karl Rockwell, MDCOT 05/04/22 08/08/22 Approved
09/07/22
 
Case 22-09: Revise Sections 311 and 312 to include cement verification specifications. Jeff Hearne,
Concrete WG
05/04/22 05/04/22 Approved
07/06/22
 
Case 22-10: Revise Section 702 to remove the 50% limit of recycled material that can be used. Jeff Hearne,
Concrete WG
05/04/22 06/24/22 Approved
08/03/22
 
Case 22-11: Revise Detail 420-1 to update Note 6. Jim Badowich, Avondale 05/04/22 06/07/22 Approved
07/06/22
 
Case 22-12: Revise Sections 615, 618 and 738 – Water Stop Gasket Requirements. Warren White, Chandler 05/04/22 06/29/22 Approved
08/03/22
 
Case 22-13: Create new Detail 200-3 to show trench cross-sections for rigid and flexible pipe. Revise Details 200-1 and 200-2. Warren White, Chandler 06/01/22 08/02/22 Approved
08/03/22
 
Case 22-14: Revise Section 750 Iron Pipe to remove cast iron. Delete Section 752 Asbestos-Cement Water Pipe. Revise Section 759 Steel Pipe to show standard length. Jim Badowich, Avondale 06/01/22 06/01/22 Approved
08/03/22
 
Case 22-15: Add new subsection 718.4 Solar Reflective Coatings. Add reference to it in Section 334. Kelly Peterich, Phoenix 07/06/22 08/22/22 Carry Forward