San Tan Valley Transportation Area Master Plan - header

Study Background

The Town of San Tan Valley is located in the southeastern portion of the Phoenix metropolitan area within northern Pinal County and serves as an important regional connection point between the urbanized areas of Maricopa County and the growing communities of Pinal County. With an estimated population exceeding 100,000 residents, San Tan Valley is one of the largest and fastest-growing communities in Pinal County and plays an increasingly important role in the regional transportation network.

The San Tan Valley Transportation Area Master Plan (TAMP) presents significant opportunities to proactively establish a coordinated and context-sensitive transportation system that supports future growth, economic development, and quality of life. The Town is uniquely positioned to create a long-term transportation vision that integrates roadway planning, multimodal connectivity, land use coordination, and regional mobility needs into a unified framework. The TAMP will provide the foundation for that effort by identifying transportation priorities, establishing a roadway classification framework, and developing implementation strategies that support the Town’s long-term vision and future development patterns.

Once complete, the San Tan Valley TAMP will establish clear priorities, cost estimates, and policies to guide decision-making, ensuring that San Tan Valley’s transportation system meets current needs while preparing for future demands. It will serve as a guiding framework for capital improvement planning, development review, and grant funding applications.

Study Objectives

The purpose of this study is to develop a Transportation Area Master Plan (TAMP) for the Town of San Tan Valley. This plan will assess existing and future multimodal travel demands within the study area and develop a program of recommended improvements that focus on serving forecasted demand, improving safety, enhancing both local and regional connectivity/mobility, and supporting the planned development.

This study includes:

  • Stakeholder Coordination
  • Safety Assessment
  • Roadway Classification System
  • Transit Feasibility Analysis
  • Network Redundancy and Connectivity Analysis
  • Intersection and Segment Analysis
  • Future Intersection Control
  • Phased Project Implementation Plan
  • Funding Strategy
  • Public Involvement
  • Exploration of Innovative and Emerging Technologies
  • Best Practices and Creative Solutions

Study Area

The San Tan Valley Transportation Master Plan will encompass San Tan Valley’s entire town boundaries. The study area extends from approximately the Arizona Farms Road to the south to Germann Road to the north, Central Arizona Project (CAP) Canal to the east and San Tan Mountain Regional Park to the west, fully encompassing the Town of San Tan Valley’s limits.

Project Schedule

San Tan Valley Timeline Graphic

Study Partners

Arizona Department Of Transportation Logo Image
Contacts
Major Projects Planning Manager
Tim Strow
Transportation Planner
Brody Cameron